How to modernize on-premises SharePoint

Learn a step by step method to modernize on-premises SharePoint without a big rewrite, using inventory, pilot migrations, and parallel running to reduce risk.

By the Cloudverg engineering team · · 7 min read

The problem

On-premises SharePoint tends to grow sideways. A team site here, a document library there, a few custom web parts built by someone who left years ago. Then a vendor or a new IT lead says the farm is out of support, or the database version is nearing end of life, and suddenly there is pressure to move everything to a new platform at once. That kind of big bang migration is where most SharePoint projects fail. You cannot test every workflow in advance, and you cannot afford to have the intranet go dark for a week.

The real problem is not the software version. It is the unknown. Nobody has a complete list of what is actually used. Some sites are abandoned. Some hold critical finance data with custom approval workflows. Some are just a file share with extra steps. Without an inventory, you cannot tell which parts need a careful rebuild and which can simply be archived or retired. That uncertainty is what makes a rewrite feel safer than it is.

Another trap is treating SharePoint as one system. It is really a collection of sites, each with its own content, permissions, workflows and integrations. Some sites can move quickly. Others need custom code rewritten or a business process rethought. A safe modernization treats each site or group of sites as its own small project, with a clear owner and a rollback plan. That way a problem in one area does not stall the whole effort.

What a good solution looks like

A good modernization plan starts with a complete inventory of sites, subsites, lists, libraries, workflows and custom code. You want to know what is used, by whom, and how often. Usage data from SharePoint's own logs or a crawler helps. But the most valuable input comes from the people who use the sites daily. They know which list is the real one and which is a stale copy. They know which workflow breaks every month. That knowledge is not in any diagram.

Next, you classify each site into one of four buckets: keep and migrate as-is, rebuild with changes, replace with a different tool, or retire. Retiring a site is often the cheapest and safest option. Many SharePoint sites exist only because nobody turned them off. A good plan gives you permission to archive or delete those, with a clear retention policy and a backup before anything is removed.

For sites that stay, the target should be a modern SharePoint environment, either on-premises with a supported version or in the cloud. But the migration should happen in waves. Start with a small pilot group of sites that are low risk but representative. Move them, run them in parallel with the old farm for a short period, and fix issues before touching the critical sites. The goal is not to finish fast. It is to finish without losing data or breaking a business process.

Finally, a good solution includes a clear rollback point for each wave. That means keeping the old farm read-only but available for a defined period, and having a tested way to restore a site from backup if something goes wrong. The plan should say who decides to roll back and what triggers that decision.

How to build it

Start with a discovery phase. Pull a list of all site collections from Central Administration or PowerShell. For each one, record the owner, the last modified date, the storage used, and any custom solutions or workflows attached. Then interview the owners and a few active users. Ask what would break if the site disappeared tomorrow. That question surfaces the real dependencies fast. Do not rely on a survey alone. A short conversation reveals more than a form.

With the inventory in hand, group sites into migration waves. Put low-risk, low-dependency sites in wave one. These are often team sites with documents and simple lists. Use them to test your migration tooling, your permissions mapping, and your user communication. Wave two can include sites with simple workflows or minor customization. Save the complex sites, the ones with custom code, third-party integrations or large document sets, for later waves. Each wave should have a defined start and end date, and a rollback window.

For each site, decide the migration method. For simple content, a tool like SharePoint Migration Tool or a third-party migrator can copy files and lists while preserving metadata and versions. For sites with custom workflows, you will likely need to rebuild them using Power Automate or a custom solution in the target environment. Test the rebuilt workflow with real data before cutover. For custom web parts, consider whether they are still needed. Many can be replaced with out-of-the-box web parts or simple SPFx components. If a web part is truly unique, plan to rewrite it, but only after confirming its business value.

Run each wave in parallel. Keep the old site read-only and redirect users to the new site with a clear banner. Give users a week or two to report issues. Track every issue in a shared list with an owner and a fix date. Only after the wave is stable do you decommission the old site. This parallel period is your safety net. It also gives you real feedback on what users actually need, which is often less than what was originally built.

Risks and how to manage them

The biggest risk is missing a dependency. A workflow that writes to a SQL database, a custom timer job, or an integration with another system can be invisible until it stops working. To manage this, ask site owners to list every system their site talks to. Then check those systems for any SharePoint connections. Also review the SharePoint logs for errors or unusual activity before migration. A dry run of the migration on a test farm can surface broken links or missing features.

Permissions are another common source of trouble. SharePoint permissions can be complex, with unique permissions on subsites and items. A migration tool may not map them perfectly. Before each wave, export the permissions of the sites involved and compare them after migration. Decide in advance which groups should have which access. Simplify where possible. Many permission problems come from years of ad hoc changes that nobody understands. Migration is a good time to clean that up.

User adoption is a risk that often gets ignored. People do not like change, especially when their daily work is affected. Communicate early and often. Explain why the move is happening, what will change, and where to get help. Provide short training sessions or quick reference guides for the new site. Nominate a champion in each team who can answer questions and gather feedback. If users feel involved, they are more likely to report issues instead of working around them.

Finally, watch for scope creep. Once people hear about the modernization, they will ask for new features or redesigns. Keep the first waves focused on like-for-like migration. New features can come later, after the platform is stable. A separate backlog for enhancements helps manage expectations without derailing the migration.

How to measure success

Measure success by business continuity, not by speed. Track the number of sites migrated per wave against the plan. But more importantly, track incidents after each wave: how many users reported problems, how long it took to fix them, and whether any business process was interrupted. A wave that finishes on time but causes a week of confusion is not a success.

User satisfaction is a leading indicator. A short pulse survey after each wave can tell you if people can find what they need and complete their tasks. Keep it to three or four questions. Also monitor support ticket volume related to SharePoint. A spike after a wave is normal, but it should drop back within a couple of weeks. If it does not, something is wrong.

Technical health matters too. Check that search works, that permissions are correct, and that workflows run without errors. Set up a simple dashboard that shows the status of each migrated site. This helps you spot problems early and gives stakeholders confidence.

Finally, measure the reduction in risk. Count how many unsupported components, custom code pieces, and orphaned sites you have eliminated. That is the real payoff: a smaller, simpler, supported environment that your team can manage. If you need help getting a clear picture before you start, a structured inventory and risk assessment can be done in a few weeks. Cloudverg offers a Legacy modernization sprint for $8,500/month that includes an inventory, a risk list, and a step by step migration sequence with rollback points. It is one option among others, but it can shorten the discovery phase and give you a plan you can execute with confidence.

Frequently asked questions

Can we migrate SharePoint without downtime?

Yes, by migrating in waves and running the old and new sites in parallel. Keep the old site read-only for a period and redirect users to the new one. This gives you a rollback option and lets users report issues while the old content is still available.

What should we do with custom SharePoint workflows?

Inventory them first. Decide which are still needed. Rebuild them in the target environment using Power Automate or a custom solution, and test with real data before cutover. Many old workflows can be simplified or retired.

How do we handle permissions during migration?

Export permissions for each site before migration and compare after. Simplify where possible. Use migration tools that map permissions, but always verify with a test group. Clean up unique permissions that are no longer needed.

Monthly plan

Want help with this? Legacy modernization sprint

$8,500/month

3 weeks · Starts within 10 business days

Three weeks to understand an old system nobody wants to touch, rank the risks and agree a step by step plan that avoids a big bang rewrite.

Renews monthly. Cancel any time.
What is included

Related guides

More custom software guides   Custom software

Smallest way to start

Get a senior architect on your problem this week

Ninety minutes a month on the cloud, AI or security question that is blocking you, a pre-read of your material and a written summary within two business days.

$450/month

Renews monthly. Cancel any time.